POWER: The
problem with the Bellarmine generator is more complicated than expected.
Repair is ongoing and the generator should be active before the summer
registration.
The remaining wood pole and
cross arm near Gate 1 is defective and will be replaced with a concrete
pole and steel cross arm on Monday, 9 April. There will be a power outage
in the Balara grid from 8:00 a.m. to 5:00 p.m. Affected units
are:
1. Blue Eagle Gym
2. Grade School Complex
3. Henry Lee Irwin Theatre
4. Manila Observatory
5. Communication Arts Building
6. College Covered Courts
7. LS Swimming Pool
8. P.E. Department
9. Smart, Globe, Nextel, Digitel and Multi Media Telephony Inc.
COMMUNICATION: The PABX/CNG
room is almost done, except for the section where the Internet Equipment
Cabinet (IEC) is located.
1. View of the entrance to
the CNG/PABX room. The gray steel door is across the steel door of the
MIS office attached to Kostka Hall.
2. The CNG will install the IEC equipment in this area.
3. The other half is where the new PABX cabinets will be installed.
4. Yellow arrow indicates the temporary plywood wall separating the
old section of the PABX room. Work on the old section of the PABX room
will start after the summer registration.
WATER: Except for the
SEC A overhead tank and Residence Hall cisterns, those recommended for
cleaning were cleaned last week. The SEC A overhead tank will be cleaned
after 4:00 p.m. today. The Cervini and Eliazo cisterns are scheduled for
cleaning on Sunday, 1 April after the boarders have gone home.
Water samples from cisterns
and overhead tanks already cleaned will be submitted to the Biology Department
for analysis on 27 March.
TRAFFIC: At 10:30 a.m.
last Thursday, 22 March, a van going to the High School along Fr. Masterson
Drive caught fire. The driver stopped the van and located the fire under
the engine. He tried to extinguish the fire using water and a rag. In
the meantime, the High School boy and his mother left the vehicle.
Fortunately the incident was
reported to the guards, who responded immediately as shown in the pictures
below:
1. The van emitting smoke
in front of the Church of the Gesu.
2. Security Detachment Commander Avelino R Guzilan rushed to
the scene with a fire extinguisher from the Office of Administrative
Services at Xavier Hall.
3. Comdr Guzilan directing the fire extinguisher foam below the engine
compartment.
4. The van is inspected after the fire was extinguished
1. Engine compartment beside
the driver covered with foam.
2. Driver side of the van where foam was directed.
3. Burned van underside below the engine compartment.
Senior Guard Supervisor
Avelino R Guzilan is commended for his presence of mind and quick
action in putting out the fire.
ldm260307
|